UNDERGROUND MDPE INSTALLATION CASE STUDY

Glass Recycling UK

Client: Glass Recycling UK, Barnsley are the UK's largest independent glass recycling company and are a client of Ormond Pipework, relying on our expertise in commercial gas pipework


The problem:


Glass Recycling UK purchased new gas fuelled plant.


To supply the new plant, their 10” underground MDPE gas pipework required an in-line tee installing. 


We were brought in to install the tee and fabricate the transition piece from MDPE to steel pipework. 


Our solution:


Ormond first indirectly purged (using nitrogen) the underground gas installation. 


An indirect purge was necessary in order to safely use hot works on the existing pipework. 


We then amended the MDPE and attached steel pipework, forming a new 10” branch. 


Once the amendment was complete, a gas tightness test was undertaken. 


Upon the successful test, we directly purged the underground pipework back to gas and issued a Gas Safe certificate to the client. 


Tasks involved:


  • Underground MDPE installation
  • Steel pipework fabrication 
  • Gas purging 
  • Gas tightness test 
  • Gas pipework commissioning
  • Gas Safe certificate 
by PETER JAMES 2 January 2025
HOT TAPPING CASE STUDY
by PETER JAMES 2 January 2025
UNDER PRESSURE DRILLING CASE STUDY
by PETER JAMES 2 January 2025
HOT TAPPING CASE STUDY
by PETER JAMES 2 January 2025
GAS INSTALLATION CASE STUDY
by PETER JAMES 2 January 2025
MDPE INSTALLATION CASE STUDY
by PETER JAMES 23 September 2024
LINE STOPPING CASE STUDY
by PETER JAMES 23 September 2024
HOT TAPPING CASE STUDY
by PETER JAMES 2 July 2024
HOT TAPPING CASE STUDY
by PETER JAMES 12 June 2024
HOT TAPPING CASE STUDY
by PETER JAMES 12 June 2024
HOT TAPPING CASE STUDY
More posts

Get A Quote Now

Describe your project requirements via the form below:

Instant Quotes  |  Free Site Visits  |  Competitive Prices

Call Now: 07917-667-450

Share by: