MDPE INSTALLATION CASE STUDY

Vauxhall, Ellesmere Port 

The problem:


Vauxhall required a new boiler house at their Ellesmere Port site. 


The project required a mains water supply to service the boilers. 


To do this, a new branch on the existing 6” water main was required. 


Our solution: 


As leading hot tapping specialists, Ormond Pipework Services were brought in to establish a live connection to the existing water supply. 


We attached a hot taping clamp to the water main and then drilled the new 50mm branch. 


After hot tapping the mains water, our pipework engineers installed 10m of underground MDPE and left off with a 50mm stop cock.


Once the MDPE installation was complete, a pressure test was completed to ensure the quality and safety of the new pipework.   


Tasks involved:


by PETER JAMES 2 January 2025
HOT TAPPING CASE STUDY
by PETER JAMES 2 January 2025
UNDER PRESSURE DRILLING CASE STUDY
by PETER JAMES 2 January 2025
HOT TAPPING CASE STUDY
by PETER JAMES 2 January 2025
GAS INSTALLATION CASE STUDY
by PETER JAMES 23 September 2024
LINE STOPPING CASE STUDY
by PETER JAMES 23 September 2024
HOT TAPPING CASE STUDY
by PETER JAMES 2 July 2024
HOT TAPPING CASE STUDY
by PETER JAMES 12 June 2024
HOT TAPPING CASE STUDY
by PETER JAMES 12 June 2024
HOT TAPPING CASE STUDY
by PETER JAMES 12 June 2024
COMMERCIAL GAS PIPEWORK INSTALLATION CASE STUDY
More posts

Get A Quote Now

Describe your project requirements via the form below:

Instant Quotes  |  Free Site Visits  |  Competitive Prices

Call Now: 07917-667-450

Share by: