Hot Tapping Case Study: Centre Parcs

HOT TAPPING CASE STUDY

Centre Parcs

Client: Center Parcs, Longleat


The problem:


Longleat Center Parcs acquired gas fed industrial boilers for their new spa. 


To feed the boilers, new branches on their existing underground MDPE gas installation was required. 


The gas supply was constantly in demand, therefore it could not be shut off and the works had to be done live. 


Ormond were brought in to do three 6” hot tappings on to an 8” MDPE gas supply.   

 

Our solution: 


Ormond attached hot tapping clamps to the existing gas pipework. 


After successful pressure tests, we began to under pressure drill the new branches. 


Once the live tappings were complete, safety blanks were attached to the valves. 


Hot tapping the connections avoided plant downtime and gas purging, which saved time and expense. 


Tasks involved:


  • Hot tapping / Under pressure drilling
  • Live tappings on MDPE gas installation
  • Underground MDPE commercial gas pipework 
by PETER JAMES 2 January 2025
HOT TAPPING CASE STUDY
by PETER JAMES 2 January 2025
UNDER PRESSURE DRILLING CASE STUDY
by PETER JAMES 2 January 2025
HOT TAPPING CASE STUDY
by PETER JAMES 2 January 2025
GAS INSTALLATION CASE STUDY
by PETER JAMES 2 January 2025
MDPE INSTALLATION CASE STUDY
by PETER JAMES 23 September 2024
LINE STOPPING CASE STUDY
by PETER JAMES 23 September 2024
HOT TAPPING CASE STUDY
by PETER JAMES 2 July 2024
HOT TAPPING CASE STUDY
by PETER JAMES 12 June 2024
HOT TAPPING CASE STUDY
by PETER JAMES 12 June 2024
COMMERCIAL GAS PIPEWORK INSTALLATION CASE STUDY
More posts

Get A Quote Now

Describe your project requirements via the form below:

Instant Quotes  |  Free Site Visits  |  Competitive Prices

Call Now: 07917-667-450

Share by: