Client: Yorkshire Plumbing & Heating Services (YPHS), on behalf of Chesterfield Hospital
YPHS and Chesterfield Hospital have trusted Ormond Pipework for our services in commercial & industrial gas pipework.
The problem: Chesterfield Hospital acquired two new gas fed industrial boilers. To supply the boilers, new gas pipework installation was required. Ormond were brought in install underground MDPE, steel pipe and a gas sub meter.
Our solution: Ormond first under pressure drilled the existing underground MDPE in order to form a new branch. 3” MDPE was then installed up to the new commercial gas sub meter. Steel pipework was fabricated to a Gas Safe standard, from the sub meter to the boilers. A successful gas tightness test was performed on the new pipework.
Ormond then did a direct gas purge and issued a commercial Gas Safe certificate to the client.
Tasks involved:
Hot tapping / under pressure drilling
Underground MDPE commercial pipework
Steel pipework fabrication
Commercial Gas sub meter
Gas purging
Gas tightness test
Gas pipework commissioning
Gas Safe certificate
“Ormond did a great job and met the standards of the NHS specifications.”
–Adrian Murten, director at Yorkshire Plumbing and Heating Services