HOT TAPPING CASE STUDY

Hilton Hotel, Heathrow Airport

The client:


Hilton Hotel at Heathrow Airport trusted hot tapping engineers, Ormond Pipework Services Ltd, to complete a live tapping on their commercial gas pipework. 


The problem:


Hilton required a new branch off their existing gas installation to supply a new boiler. Downtime of the gas supply was not an option because the hotel was in use.


The only way to avoid downtime was to live tap the gas pipework. Ormond were brought in to perform a hot tapping in order to form the new branch. 

 

Our solution: 


Ormond welded a 3” on 10” hot tapping saddle to the existing pipework. 


After a successful pressure test, we began to under pressure drill the existing system. 


Once the live tapping was complete, a safety blank was attached to the valve. 


Hot tapping the connection avoided plant downtime, purging and testing.

 

Tasks involved:


  • Hot tapping / Under pressure drilling on gas
  • Live tapping on steel pipework 
  • Pipe welding 
by PETER JAMES 2 January 2025
UNDER PRESSURE DRILLING CASE STUDY
by PETER JAMES 2 January 2025
HOT TAPPING CASE STUDY
by PETER JAMES 2 January 2025
GAS INSTALLATION CASE STUDY
by PETER JAMES 2 January 2025
MDPE INSTALLATION CASE STUDY
by PETER JAMES 23 September 2024
LINE STOPPING CASE STUDY
by PETER JAMES 23 September 2024
HOT TAPPING CASE STUDY
by PETER JAMES 2 July 2024
HOT TAPPING CASE STUDY
by PETER JAMES 12 June 2024
HOT TAPPING CASE STUDY
by PETER JAMES 12 June 2024
HOT TAPPING CASE STUDY
by PETER JAMES 12 June 2024
COMMERCIAL GAS PIPEWORK INSTALLATION CASE STUDY
More posts

Get A Quote Now

Describe your project requirements via the form below:

Instant Quotes  |  Free Site Visits  |  Competitive Prices

Call Now: 07917-667-450

Share by: