COMMERCIAL GAS INSTALLATION CASE STUDY

Wavin Ltd

Client: Bailey Johns Ltd, on behalf of Wavin Ltd, a global manufacturer and supplier of drainage piping.


The problem:


Wavin had a faulty solenoid valve which was restricting the gas flow to their appliances.


It was determined that a new solenoid valve was required.


To replace the existing valve, alterations to the gas pipework were necessary. To safely amend the pipework, the gas installation had to be indirectly purged out.


Our solution:


Our commercial gas engineers first conducted a nitrogen purge on the existing pipework. This made it safe for hot works such as welding and grinding.


Once the gas pipework was complete, the new solenoid valve was installed.


We then performed a gas tightness test to make sure the existing installation met current Gas Safe standards. A direct purge to gas was undertaken and finally a Gas Safe certificate was issued. 

Tasks involved:


Client testimony:


“Ormond are safe and reliable, that’s why we call them to help with our commercial gas pipework contracts” 


Julian Hall: Bailey Johns Ltd Chief Engineer, on behalf of Wavin Ltd, Doncaster

18/01/2024

by PETER JAMES 2 January 2025
HOT TAPPING CASE STUDY
by PETER JAMES 2 January 2025
UNDER PRESSURE DRILLING CASE STUDY
by PETER JAMES 2 January 2025
HOT TAPPING CASE STUDY
by PETER JAMES 2 January 2025
GAS INSTALLATION CASE STUDY
by PETER JAMES 2 January 2025
MDPE INSTALLATION CASE STUDY
by PETER JAMES 23 September 2024
LINE STOPPING CASE STUDY
by PETER JAMES 23 September 2024
HOT TAPPING CASE STUDY
by PETER JAMES 2 July 2024
HOT TAPPING CASE STUDY
by PETER JAMES 12 June 2024
HOT TAPPING CASE STUDY
by PETER JAMES 12 June 2024
HOT TAPPING CASE STUDY
More posts

Get A Quote Now

Describe your project requirements via the form below:

Instant Quotes  |  Free Site Visits  |  Competitive Prices

Call Now: 07917-667-450

Share by: